Transport minister inspects work on Cairo/Alex. desert road

Minister of Transport Kamel el-Wazir inspected Monday a number of projects and bridges under construction on Cairo/Alex. desert road.

The projects include setting up a three-lane 14 meter-wide bridge on Cairo/Alex desert road for those coming from Alexandria, Borg el-Arab and El Agami, at a total cost of EGP 80 mn.

The new bridge is to facilitate citizens’ movement and ease traffic flow.

The minister also inspected the expansion of the entrance of Borg el-Arab Bridge to reach a width of 16 meters and includes 4 lanes, along with expanding El Agami entrance, all at a total cost of EGP 200 mn.

Wazir instructed adhering to high quality standards in implementation of all ventures, along with finalizing work as schedule

 

 

 

 

Source: State Information Service Egypt

Total
0
Shares
Previous Article

Prices of foreign currencies up

Next Article

Two years after reporting the first case in Syria ,18 new Covid-19 cases recorded Tuesday

Related Posts

US job openings fall to 10.8M in January

US job openings fell to 10.8 million in January, coming in higher than market expectations of 10.5 million, according to Labor Department figures.The number and rate of job openings decreased by 410,000 and 6.5%, respectively, the department said in a ...