PM inspects Tahya Misr multi-purposes terminal at Alexandria Port

Prime Minister Mostafa Madbouli inspected on Saturday 31/12/2022 Tahya Misr multi-purposes terminal, established on berths (55-62) at Alexandria Port.The terminal is expected to be experimentally operated by the second half of January upon presidential…

Prime Minister Mostafa Madbouli inspected on Saturday 31/12/2022 Tahya Misr multi-purposes terminal, established on berths (55-62) at Alexandria Port.

The terminal is expected to be experimentally operated by the second half of January upon presidential directives to develop the ports.

Transport Minister Kamel El Wazir, who accompanied Madbouli, explained the handling process of the containers at the terminal.

Located on an area of 500,000 square meters, the terminal has a berths length of about 2.5 km.

Source: State Information Service Egypt

Total
0
Shares
Previous Article

NWTN Delivers First Batch of Electric Vehicles to Client in the UAE

Next Article

‫يشهد توسع UnionPay International المستمر لشبكتها العالمية إصدار أكثر من 200 مليون بطاقة خارج البر الرئيسي الصيني

Related Posts

Jordan, Iran foreign ministers talk stopping war on Gaza

Geneva: Foreign Minister Ayman Safadi and Iranian Foreign Minister Hossein Abdollahian Wednesday discussed on the sidelines of the Refugee Forum in Geneva mobilising international support to stop the Israeli war on Gaza. Safadi and Abdollahian discus...